Everything Mary Jumbo Rolling Sewing Machine Case with 5 Wheels in Grey Quilted Floral – Extra-Large Padded Craft Storage Tote for Travel & Classes

Everything Mary Jumbo Rolling Sewing Machine Case with 5 Wheels in Grey Quilted Floral – Extra-Large Padded Craft Storage Tote for Travel & Classes

$224.99
Skip to product information
Everything Mary Jumbo Rolling Sewing Machine Case with 5 Wheels in Grey Quilted Floral – Extra-Large Padded Craft Storage Tote for Travel & Classes

Everything Mary Jumbo Rolling Sewing Machine Case with 5 Wheels in Grey Quilted Floral – Extra-Large Padded Craft Storage Tote for Travel & Classes

$224.99

Haul it all with the Everything Mary Jumbo Rolling Sewing Machine Case in Grey Quilted Floral. Built for makers who travel with large machines and plenty of supplies, this extra-large wheeled case offers padded protection while keeping fabric, thread, and tools neatly organized. Five smooth spinner wheels and a fold-flat handle make moving a heavy load easy, so every project starts calmer, feels lighter, and stays organized from setup to cleanup.

  • Jumbo padded interior – Holds large machines plus fabric, patterns, and project supplies with capacity to spare.
  • Five-wheel mobility – Five 360-degree spinner wheels and a fold-flat handle move a heavy, loaded case with ease.
  • Padded protection – Cushioned walls help shield your machine and supplies from bumps during transport.
  • Smart organized storage – Dedicated interior and exterior spaces keep cords, notions, and tools easy to reach.
  • Collapsible design – Structured in use and folds flat for convenient storage when space is limited.

Thoughtfully designed by makers, for makers, it keeps your machine protected and your supplies in order—so you can focus on the simple joy of creating.

Fit & Dimensions

  • Interior (W x D x H): 28" x 14" x 14.5"
  • Exterior (W x D x H): 31" x 14.25" x 19"

Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements above to ensure the best fit.

You may also like