Everything Mary XL Rolling Sewing Machine Case with Wheels in Quilted Pattern – Sewing Machine Tote Bag for Travel, Classes & Quilting
Sew anywhere with the Everything Mary XL Rolling Sewing Machine Case in Quilted Pattern. Built for makers who create at home and on the move, this wheeled case protects most standard sewing and embroidery machines while keeping fabric, thread, and tools neatly organized. A telescopic handle and smooth wheels make transport to classes and retreats easy, so every project starts calmer, feels lighter, and stays beautifully organized from setup to cleanup.
- Spacious interior – Securely holds most standard sewing machines with extra room for fabric, patterns, thread, and tools.
- Smooth rolling mobility – Four 360-degree spinner wheels and a telescopic handle make moving a heavy machine effortless.
- Organized storage – Multiple interior and exterior pockets keep accessories visible, secure, and easy to reach.
- Collapsible design – Structured in use and folds flat for convenient storage when space is limited.
- Durable construction – Quality materials and reinforced stitching stand up to frequent use and on-the-go crafting.
Thoughtfully designed by makers, for makers, it keeps your machine protected and your supplies in order—so you can focus on the simple joy of creating.
Fit & Dimensions
- Interior (W x D x H): 19.5" x 10.5" x 14"
- Exterior (W x D x H): 22" x 13.5" x 17.75"
Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements above to ensure the best fit.